Turnaround Times

This page outlines general turnaround times for common heat treatment processes.

Heat Treating Department Shop Floor

Flame Curtain of Sealed Quench Furnace

Air Hardening

D2, 400 Stainless Steel, H13
Allow 2 days
A2, Calmax
Allow 3-4 days
2767, A6
Allow 3-4 days
High Speed Steel, CPM
Weekends Only (Subject to load size / quantity)

Aluminium Treatment

Most Materials
Allow 3-4 days

Annealing

Solution Annealing (Stainless Steel)
Allow 2 days
Tool Steel Annealing
Weekends Only

Carbonitriding

Most Materials
Allow 3 days

Carburising

Most Materials
Allow 3 days

Cryogenic Tempering

Most Materials
Phone for details

Induction Hardening

Most Materials
Allow 2 days

Nitriding

Short Run Nitriding
Allow 1 day
Long Run Nitriding
Allow 2 days

Oil Hardening

4130, 4140, 4340
Allow 2-3 days
1050, 1070
Allow 2-3 days
O1 - Gauge Plate
Allow 2-3 days
S1, S5
Allow 2-3 days
EN30B, EN45
Allow 2-3 days

Stress Relieving

Most Materials
Allow 1 day

The Small Print

• All turnaround times quoted apply to normal jobbing work only, and the times are determined as 24-hour blocks, from 2pm to 2pm, Mondays to Fridays. These guidelines only apply for work received into our receiving area, and does not include time in transit to and from Heat Treatments.

• If any preparation work is required before processing can be undertaken, (e.g. pre-cleaning, annealing, plating-off, centreing pins, etc), the turnaround time may be delayed accordingly.

• For work to be processed efficiently, customers’ should endeavour to have their work at Heat Treatments premises by 2pm at the latest, or the work may not start to be processed until the following day.

• Customers’ work should be ready for pick-up after 2pm on the day of completion of processing, or for Auckland deliveries the work can be dispatched on our van the following day.

• Turnaround times for larger quantities and/or batch work, and large work pieces, can be provided by arrangement.

• On occasions where quicker turnaround times are required please contact us directly to see if this is possible, however, these are handled as exceptions on a case by case basis and a surcharge may apply.

• These “turnaround” times are a guide to assist our customers with their planning. They are supplied with our best intentions and a high confidence level of achievement, however, on the rare occasion that we may not meet these guidelines, whatever the circumstances, Heat Treatments Limited will not be held liable for any loss or damages suffered.